Installation steps
1. Roll out the tape
Roll out the tape to the required length and cut to size.
2. Tape to the wall
Fold the tape at an angle and push into
the corner of the wall/floor.
Piece by piece, remove the first release paper and gradually stick tape to the wall.
3. Tape to the floor
Piece by piece, remove the second release paper and gradually stick tape to the floor.
4. Rub firmly to secure the adhesive bond
Firmly press tape onto wall and floor.
The pressing aid pro clima PRESSFIX is particularly efficient and protects your hands.
5. Also adheres to concrete
EXTOSEAL FINOC can also be stuck directly
onto concrete.
Where necessary, prepare the subgrade with TESCON PRIMER.
6. Application under eaves beam
Can also be used as a barrier layer to protect wooden parts such as thresholds or eaves beams, against increasing moisture from concrete parts (floorboard, tie beam, etc.).